4.1 Provision of IT/OT data-driven solutions for leakage reduction (sustainable use and protection of water and marine resources)
Kurzbeschreibung
The activity manufactures, develops, installs, deploys, maintains, repairs or provides professional services, including technical consulting for design or monitoring, for information technology (IT) or operational technology (OT) data driven solutions (21) to control, manage, reduce and mitigate leakage in water supply systems (WSSs). The economic activities in this category could be associated with several NACE codes, in particular E36, F42.99 and J62 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006. An economic activity in this category is an enabling activity in accordance with Article 12(1), point (e), of Regulation (EU) 2020/852 where it complies with the technical screening criteria set out in this Section.
Wirtschaftsaktivität (EU-Taxonomie)
Rechtsakt: 2023/2486, Anhang I, Abschnitt 4.1
Umweltziel: sustainable use and protection of water and marine resources
NACE-Codes: E36, F42.99, J62
Beschreibung
The activity manufactures, develops, installs, deploys, maintains, repairs or provides professional services, including technical consulting for design or monitoring, for information technology (IT) or operational technology (OT) data driven solutions (21) to control, manage, reduce and mitigate leakage in water supply systems (WSSs). The economic activities in this category could be associated with several NACE codes, in particular E36, F42.99 and J62 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006. An economic activity in this category is an enabling activity in accordance with Article 12(1), point (e), of Regulation (EU) 2020/852 where it complies with the technical screening criteria set out in this Section.
Technische Bewertungskriterien
Technical screening criteria Substantial contribution to the sustainable use and protection of water and marine resources 1. The economic activity manufactures, develops, installs, deploys, maintains, repairs or provides professional services, including technical consulting for design or monitoring, to one or more of the following IT/OT data-driven solutions to control, manage, reduce and mitigate leakage in the new or existing water supply systems: (a) monitoring systems including holistic IT/OT suites/tools, or add-ons/extensions to such tools that provide identification, tracking and tracing water leakage; (b) IT/OT solutions, or add-ons/extensions to such tools, that provide controlling, managing and mitigating water leakage; (c) IT/OT solutions, or add-ons/extensions to such tools, that ensure interoperability of systems in district metered areas when new monitoring systems or IT/OT solutions are installed. (20) Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the conservation of wild birds (OJ L 20, 26.1.2010, p. 7). (21) ‘IT or OT data-driven solutions’ include connectable products, sensors, analytics and other software, and information and communication technologies (ICT) for the transmission, storage and display of data and system management. OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 22/164 2. Environmental degradation risks related to preserving water quality and avoiding water stress are identified and addressed to achieve good water status and good ecological potential as defined in Article 2, points (22) and (23), of Regulation (EU) 2020/852, in accordance with Directive 2000/60/EC (22) and in line with a water use and protection management plan, developed thereunder for the potentially affected water body or bodies, in consultation with relevant stakeholders. Do no significant harm (‘DNSH’) (1) Climate change mitigation N/A (2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex. (4) Transition to a circular economy Measures are in place to manage and recycle waste at the end-of life, including through decommissioning contractual agreements with recycling service providers, reflection in financial projections or official project documentation. These measures ensure that components and materials are segregated and treated to maximise recycling and reuse in accordance with the waste hierarchy, EU waste regulation principles and applicable regulations, in particular through the reuse and recycling of batteries and electronics and the critical raw materials therein. These measures also include the control and management of hazardous materials. Preparation for re-use, recovery or recycling operations, or proper treatment, including the removal of all fluids and a selective treatment are performed in accordance with Annex VII to Directive 2012/19/EU of the European Parliament and of the Council (23). (5) Pollution prevention and control The equipment used meets the requirements laid down in Directive 2009/125/EC of the European Parliament and of the Council (24) for servers and data storage products. The equipment used does not contain the restricted substances listed in Annex II to Directive 2011/65/EU of the European Parliament and of the Council (25), except where the concentration values by weight in homogeneous materials do not exceed the maximum values listed in that Annex. (6) Protection and restoration of biodiversity and ecosys tems N/A (22) For activities in third countries, in accordance with applicable national law or international standards which pursue equivalent objectives of good water status and good ecological potential, through equivalent procedural and substantive rules, i.e. a water use and protection management plan developed in consultation with relevant stakeholders which ensures that (1) the impact of the activities on the identified status or ecological potential of potentially affected water body or bodies is assessed; and (2) deterioration or prevention of good status/ecological potential is avoided. (23) Directive 2012/19/EU of the European Parliament and of the Council of 4 July 2012 on waste electrical and electronic equipment (WEEE) (OJ L 197, 24.7.2012, p. 38). (24) Directive 2009/125/EC of the European Parliament and of the Council of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products (OJ L 285, 31.10.2009, p. 10). (25) Directive 2011/65/EU of the European Parliament and of the Council of 8 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (OJ L 174, 1.7.2011, p. 88). OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 23/164 Appendix A Generic criteria for DNSH to climate change adaptation I. Criteria The physical climate risks that are material to the activity have been identified from those listed in the table in Section II of this Appendix by performing a robust climate risk and vulnerability assessment with the following steps: (a) screening of the activity to identify which physical climate risks from the list in Section II of this Appendix may affect the performance of the economic activity during its expected lifetime; (b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Section II of this Appendix, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the economic activity; (c) an assessment of adaptation solutions that can reduce the identified physical climate risk. The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such that: (a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate projections at the smallest appropriate scale; (b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate projections across the existing range of future scenarios (1) consistent with the expected lifetime of the activity, including, at least, 10- to 30-year climate projections scenarios for major investments. The climate projections and assessment of impacts are based on best practice and available guidance and take into account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most recent Intergovernmental Panel on Climate Change reports (2), scientific peer-reviewed publications, and open source (3) or paying models. For existing activities and new activities using existing physical assets, the economic operator implements physical and non-physical solutions (‘adaptation solutions’), over a period of time of up to five years, that reduce the most important identified physical climate risks that are material to that activity. An adaptation plan for the implementation of those solutions is drawn up accordingly. For new activities and existing activities using newly-built physical assets, the economic operator integrates the adaptation solutions that reduce the most important identified physical climate risks that are material to that activity at the time of design and construction and has implemented them before the start of operations. The adaptation solutions implemented do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of nature, of cultural heritage, of assets and of other economic activities; are consistent with local, sectoral, regional or national adaptation strategies and plans; and consider the use of nature- based solutions (4) or rely on blue or green infrastructure (5) to the extent possible. (1) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0 and RCP8.5. (2) Assessment Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.ipcc.ch/ reports/. (3) Such as Copernicus services managed by the European Commission. (4) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version of 27.6.2023: https://ec.europa.eu/research/environment/index.cfm?pg=nbs). (5) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital (COM(2013) 249 final). OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 24/164 II. Classification of climate-related hazards (6) Temperature-related Wind-related Water-related Solid mass-related Chronic Changing temperature (air, freshwater, marine water) Changing wind patterns Changing precipitation patterns and types (rain, hail, snow/ice) Coastal erosion Heat stress Precipitation or hydrological variability Soil degradation Temperature variability Ocean acidification Soil erosion Permafrost thawing Saline intrusion Solifluction Sea level rise Water stress Acute Heat wave Cyclone, hurricane, typhoon Drought Avalanche Cold wave/frost Storm (including blizzards, dust and sandstorms) Heavy precipitation (rain, hail, snow/ice) Landslide Wildfire Tornado Flood (coastal, fluvial, pluvial, ground water) Subsidence Glacial lake outburst (6) The list of climate-related hazards in this table is non-exhaustive, and constitutes only an indicative list of most widespread hazards that are to be taken into account as a minimum in the climate risk and vulnerability assessment. OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 25/164 Appendix C Generic criteria for DNSH to pollution prevention and control regarding use and presence of chemicals The activity does not lead to the manufacture, placing on the market or use of: (a) substances, whether on their own, in mixtures or in articles, listed in Annexes I or II to Regulation (EU) 2019/1021 of the European Parliament and of the Council (1), except in the case of substances present as an unintentional trace contaminant; (b) mercury and mercury compounds, their mixtures and mercury-added products as defined in Article 2 of Regulation (EU) 2017/852 of the European Parliament and of the Council (2); (c) substances, whether on their own, in mixture or in articles, listed in Annexes I or II to Regulation (EC) No 1005/2009 of the European Parliament and of the Council (3); (d) substances, whether on their own, in mixtures or in articles, listed in Annex II to Directive 2011/65/EU, except where there is full compliance with Article 4(1) of that Directive; (e) substances, whether on their own, in mixtures or in an article, listed in Annex XVII to Regulation (EC) No 1907/2006 of the European Parliament and of the Council (4), except where there is full compliance with the conditions specified in that Annex; (f) substances, whether on their own, or in mixtures or in an article, in a concentration above 0,1 % weight by weight (w/w), and meeting the criteria laid down in Article 57 of Regulation (EC) No 1907/2006 and that were identified in accordance with Article 59(1) of that Regulation for a period of at least 18 months, except if it is assessed and documented by the operators that no other suitable alternative substances or technologies are available on the market, and that they are used under controlled conditions (5). In addition, the activity does not lead to the manufacture, presence in the final product or output, or placing on the market, of other substances, whether on their own, or in mixtures or in an article, in a concentration above 0,1 % weight by weight (w/w), that meet the criteria of Regulation (EC) No 1272/2008 for one of the hazard classes or hazard categories mentioned in Article 57 of Regulation (EC) No 1907/2006, except if it is assessed and documented by the operators that no other suitable alternative substances or technologies are available on the market, and that they are used under controlled conditions (6). (1) Regulation (EU) 2019/1021 of the European Parliament and of the Council of 20 June 2019 on persistent organic pollutants (OJ L 169, 25.6.2019, p. 45). (2) Regulation (EU) 2017/852 of the European Parliament and of the Council of 17 May 2017 on mercury, and repealing Regulation (EC) No 1102/2008 (OJ L 137, 24.5.2017, p. 1). (3) Regulation (EC) No 1005/2009 of the European Parliament and of the Council of 16 September 2009 on substances that deplete the ozone layer (OJ L 286, 31.10.2009, p. 1). (4) Regulation (EC) No 1907/2006 of the European Parliament and of the Council of 18 December 2006 concerning the Registration, Evaluation, Authorisation and Restriction of Chemicals (REACH), establishing a European Chemicals Agency, amending Directive 1999/45/EC and repealing Council Regulation (EEC) No 793/93 and Commission Regulation (EC) No 1488/94 as well as Council Directive 76/769/EEC and Commission Directives 91/155/EEC, 93/67/EEC, 93/105/EC and 2000/21/EC (OJ L 396, 30.12.2006, p. 1). (5) The Commission will review the exceptions from the prohibition from manufacturing, placing on the market or use of the substances referred to in point (f) once it will have published horizontal principles on essential use of chemicals. (6) The Commission will review the exceptions from the prohibition from manufacture, presence in the final product or output, or placing on the market of the substances referred to in this paragraph once it will have published horizontal principles on essential use of chemicals. OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 26/164 Appendix D Generic criteria for DNSH to protection and restoration of biodiversity and ecosystems An Environmental Impact Assessment (EIA) or screening (1) has been completed in accordance with Directive 2011/92/EU (2). Where an EIA has been carried out, the required mitigation and compensation measures for protecting the environment are implemented. For sites/operations located in or near biodiversity-sensitive areas (including the Natura 2000 network of protected areas, UNESCO World Heritage sites and Key Biodiversity Areas, as well as other protected areas), an appropriate assessment (3), where applicable, has been conducted and based on its conclusions the necessary mitigation measures (4) are implemented. (1) The procedure through which the competent authority determines whether projects listed in Annex II to Directive 2011/92/EU is to be made subject to an environmental impact assessment (as referred to in Article 4(2) of that Directive). (2) For activities in third countries, in accordance with equivalent applicable national law or international standards requiring the completion of an EIA or screening, for example, IFC Performance Standard 1: Assessment and Management of Environmental and Social Risks. (3) In accordance with Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the conservation of wild birds (OJ L 20, 26.1.2010, p. 7) and Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and flora (OJ L 206, 22.7.1992, p. 7). For activities located in third countries, in accordance with equivalent applicable national law or international standards, that aim at the conservation of natural habitats, wild fauna and wild flora, and that require to carry out (1) a screening procedure to determine whether, for a given activity, an appropriate assessment of the possible impacts on protected habitats and species is needed; (2) such an appropriate assessment where the screening determines that it is needed, for example IFC Performance Standard 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources. (4) Those measures have been identified to ensure that the project, plan or activity will not have any significant effects on the conservation objectives of the protected area. OJ L, 21.11.2023 ELI: http://data.europa.eu/eli/reg_del/2023/2486/oj 27/164 ANNEX II Technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to the transition to a circular economy and for determining whether that economic activity causes no significant harm to any of the other environmental objectives Table of Contents Page 1. Manufacturing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28 1.1. Manufacture of plastic packaging goods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28 1.2. Manufacture of electrical and electronic equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 2. Water supply, sewerage, waste management and remediation activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 2.1. Phosphorus recovery from waste water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 2.2. Production of alternative water resources for purposes other than human consumption . . . . . . . . . . . . . . . . . . . . . . . . .40 2.3. Collection and transport of non-hazardous and hazardous waste . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42 2.4. Treatment of hazardous waste . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44 2.5. Recovery of bio-waste by anaerobic digestion or composting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46 2.6. Depollution and dismantling of end-of-life products . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 2.7. Sorting and material recovery of non-hazardous waste . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49 3. Construction and real estate activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51 3.1. Construction of new buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51 3.2. Renovation of existing buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55 3.3. Demolition and wrecking of buildings and other structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59 3.4. Maintenance of roads and motorways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Diese Angaben wurden ohne KI deterministisch aus den Tabellen der genannten Quelldokumente geparst. Fehler bei der PDF-Auswertung sind dennoch möglich – im Zweifel gilt das Quelldokument.