7.1 Construction of new buildings (climate change mitigation)

Wirtschaftsaktivitäten (EU-Taxonomie) Europäische Union

Kurzbeschreibung

Development of building projects for residential and non-residential buildings by bringing together financial, technical and physical means to realise the building projects for later sale as well as the construction of complete residential or non-residential buildings, on own account for sale or on a fee or contract basis. The economic activities in this category could be associated with several NACE codes, in particular F41.1 and F41.2, including also activities under F43, in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.

Wirtschaftsaktivität (EU-Taxonomie)

Rechtsakt: 2021/2139, Anhang I, Abschnitt 7.1 · CONSTRUCTION AND REAL ESTATE

Umweltziel: climate change mitigation

NACE-Codes: F41.1, F41.2, F43

Beschreibung

Development of building projects for residential and non-residential buildings by bringing together financial, technical and physical means to realise the building projects for later sale as well as the construction of complete residential or non-residential buildings, on own account for sale or on a fee or contract basis. The economic activities in this category could be associated with several NACE codes, in particular F41.1 and F41.2, including also activities under F43, in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.

Technische Bewertungskriterien

Technical screening criteria Substantial contribution to climate change mitigation Constructions of new buildings for which: 1. The Primary Energy Demand (PED) ( 281 ), defining the energy performance of the building resulting from the construction, is at least 10 % lower than the threshold set for the nearly zero-energy building (NZEB) requirements in national measures implementing Directive 2010/31/EU of the European Parliament and of the Council ( 282 ). The energy performance is certified using an as built Energy Performance Certificate (EPC). 2. For buildings larger than 5 000 m 2 ( 283 ), upon completion, the building resulting from the construction undergoes testing for air-tightness and thermal integrity ( 284 ), and any deviation in the levels of performance set at the design stage or defects in the building envelope are disclosed to investors and clients. As an alternative; where robust and traceable quality control processes are in place during the construction process this is acceptable as an alternative to thermal integrity testing. 3. For buildings larger than 5 000 m 2 ( 285 ), the life-cycle Global Warming Potential (GWP) ( 286 ) of the building resulting from the construction has been calculated for each stage in the life cycle and is disclosed to investors and clients on demand. _____________ ( 281 ) The calculated amount of energy needed to meet the energy demand associated with the typical uses of a building expressed by a numeric indicator of total primary energy use in kWh/m 2 per year and based on the relevant national calculation methodology and as displayed on the Energy Performance Certificate (EPC). ( 282 ) Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings (OJ L 153, 18.6.2010, p. 13). ( 283 ) For residential buildings, the testing is made for a representative set of dwelling/apartment types. ( 284 ) The testing is carried out in accordance with EN13187 (Thermal Performance of Buildings - Qualitative Detection of Thermal Irregularities in Building Envelopes - Infrared Method) and EN 13829 (Thermal performance of buildings. Determination of air permeability of buildings. Fan pressurisation method) or equivalent standards accepted by the respective building control body where the building is located. ( 285 ) For residential buildings, the calculation and disclosure are made for a representative set of dwelling/apartment types. ( 286 ) The GWP is communicated as a numeric indicator for each life cycle stage expressed as kgCO 2 e/m 2 (of useful internal floor area) averaged for one year of a reference study period of 50 years. The data selection, scenario definition and calculations are carried out in accordance with EN 15978 (BS EN 15978:2011. Sustainability of construction works. Assessment of environmental performance of buildings. Calculation method). The scope of building elements and technical equipment is as defined in the Level(s) common EU framework for indicator 1.2. Where a national calculation tool exists, or is required for making disclosures or for obtaining building permits, the respective tool may be used to provide the required disclosure. Other calculation tools may be used if they fulfil the minimum criteria laid down by the Level(s) common EU framework (version of 4.6.2021: https://susproc.jrc.ec.europa.eu/product-bureau/product-groups/412/documents), see indicator 1.2 user manual. Do no significant harm (‘DNSH’) (2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex. (3) Sustainable use and protection of water and marine resources Where installed, except for installations in residential building units, the specified water use for the following water appliances are attested by product datasheets, a building certification or an existing product label in the Union, in accordance with the technical specifications laid down in Appendix E to this Annex: (a) wash hand basin taps and kitchen taps have a maximum water flow of 6 litres/min; (b) showers have a maximum water flow of 8 litres/min; (c) WCs, including suites, bowls and flushing cisterns, have a full flush volume of a maximum of 6 litres and a maximum average flush volume of 3,5 litres; (d) urinals use a maximum of 2 litres/bowl/hour. Flushing urinals have a maximum full flush volume of 1 litre. To avoid impact from the construction site, the activity complies with the criteria set out in Appendix B to this Annex. (4) Transition to a circular economy At least 70 % (by weight) of the non-hazardous construction and demolition waste (excluding naturally occurring material referred to in category 17 05 04 in the European List of Waste established by Decision 2000/532/EC) generated on the construction site is prepared for reuse, recycling and other material recovery, including backfilling oper­ ations using waste to substitute other materials, in accordance with the waste hierarchy and the EU Construction and Demolition Waste Management Protocol ( 287 ). Operators limit waste generation in processes related to construction and demolition, in accordance with the EU Construction and Demolition Waste Management Protocol and taking into account best available techniques and using selective demolition to enable removal and safe handling of hazardous substances and facilitate reuse and high-quality recycling by selective removal of materials, using available sorting systems for construction and demolition waste. Building designs and construction techniques support circularity and in particular demonstrate, with reference to ISO 20887 ( 288 ) or other standards for assessing the disassembly or adaptability of buildings, how they are designed to be more resource efficient, adaptable, flexible and dismantleable to enable reuse and recycling. (5) Pollution prevention and control Building components and materials used in the construction comply with the criteria set out in Appendix C to this Annex. _____________ ( 287 ) EU Construction and Demolition Waste Protocol (version of 4.6.2021: https://ec.europa.eu/growth/content/eu-construction-and- demolition-waste-protocol-0_en). ( 288 ) ISO 20887:2020, Sustainability in buildings and civil engineering works - Design for disassembly and adaptability - Principles, requirements and guidance (version of 4.6.2021: https://www.iso.org/standard/69370.html). Building components and materials used in the construction that may come into contact with occupiers ( 289 ) emit less than 0,06 mg of formal­ dehyde per m 3 of material or component upon testing in accordance with the conditions specified in Annex XVII to Regulation (EC) No 1907/2006 and less than 0,001 mg of other categories 1A and 1B carcinogenic volatile organic compounds per m 3 of material or component, upon testing in accordance with CEN/EN 16516 ( 290 ) or ISO 16000-3:2011 ( 291 ) or other equivalent standardised test conditions and determination methods ( 292 ). Where the new construction is located on a potentially contaminated site (brownfield site), the site has been subject to an investigation for potential contaminants, for example using standard ISO 18400 ( 293 ). Measures are taken to reduce noise, dust and pollutant emissions during construction or maintenance works. (6) Protection and restoration of biodiversity and ecosystems The activity complies with the criteria set out in Appendix D to this Annex. The new construction is not built on one of the following: (a) arable land and crop land with a moderate to high level of soil fertility and below ground biodiversity as referred to the EU LUCAS survey ( 294 ); (b) greenfield land of recognised high biodiversity value and land that serves as habitat of endangered species (flora and fauna) listed on the European Red List ( 295 ) or the IUCN Red List ( 296 ); (c) land matching the definition of forest as set out in national law used in the national greenhouse gas inventory, or where not available, is in accordance with the FAO definition of forest ( 297 ).

Diese Angaben wurden ohne KI deterministisch aus den Tabellen der genannten Quelldokumente geparst. Fehler bei der PDF-Auswertung sind dennoch möglich – im Zweifel gilt das Quelldokument.