7.3 Installation, maintenance and repair of energy efficiency equipment (climate change mitigation)
Kurzbeschreibung
Individual renovation measures consisting in installation, maintenance or repair of energy efficiency equipment. The economic activities in this category could be associated with several NACE codes, in particular F42, F43, M71, C16, C17, C22, C23, C25, C27, C28, S95.21, S95.22, C33.12 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006. An economic activity in this category is an enabling activity as referred to in Article 10(1), point (i), of Regulation (EU) 2020/852 where it complies with the technical screening criteria set out in this Section.
Wirtschaftsaktivität (EU-Taxonomie)
Rechtsakt: 2021/2139, Anhang I, Abschnitt 7.3 · CONSTRUCTION AND REAL ESTATE
Umweltziel: climate change mitigation
NACE-Codes: F42, F43, M71, C16, C17, C22, C23, C25, C27, C28, S95.21, S95.22, C33.12
Beschreibung
Individual renovation measures consisting in installation, maintenance or repair of energy efficiency equipment. The economic activities in this category could be associated with several NACE codes, in particular F42, F43, M71, C16, C17, C22, C23, C25, C27, C28, S95.21, S95.22, C33.12 in accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006. An economic activity in this category is an enabling activity as referred to in Article 10(1), point (i), of Regulation (EU) 2020/852 where it complies with the technical screening criteria set out in this Section.
Technische Bewertungskriterien
Technical screening criteria Substantial contribution to climate change mitigation The activity consists in one of the following individual measures provided that they comply with minimum requirements set for individual components and systems in the applicable national measures implementing Directive 2010/31/EU and, where applicable, are rated in the highest two populated classes of energy efficiency in accordance with Regulation (EU) 2017/1369 and delegated acts adopted under that Regulation: (a) addition of insulation to existing envelope components, such as external walls (including green walls), roofs (including green roofs), lofts, basements and ground floors (including measures to ensure air-tightness, measures to reduce the effects of thermal bridges and scaffolding) and products for the application of the insulation to the building envelope (including mechanical fixings and adhesive); _____________ ( 301 ) ISO 20887:2020, Sustainability in buildings and civil engineering works - Design for disassembly and adaptability - Principles, requirements and guidance (version of 4.6.2021: https://www.iso.org/standard/69370.html). ( 302 ) Applying to paints and varnishes, ceiling tiles, floor coverings (including associated adhesives and sealants), internal insulation and interior surface treatments (such as to treat damp and mould). ( 303 ) ISO 16000-3:2011, Indoor air — Part 3: Determination of formaldehyde and other carbonyl compounds in indoor air and test chamber air — Active sampling method (version of 4.6.2021: https://www.iso.org/standard/51812.html). ( 304 ) The emissions thresholds for carcinogenic volatile organic compounds relate to a 28-day test period. (b) replacement of existing windows with new energy efficient windows; (c) replacement of existing external doors with new energy efficient doors; (d) installation and replacement of energy efficient light sources; (e) installation, replacement, maintenance and repair of heating, ventilation and air-conditioning (HVAC) and water heating systems, including equipment related to district heating services, with highly efficient tech nologies; (f) installation of low water and energy using kitchen and sanitary water fittings which comply with technical specifications set out in Appendix E to this Annex and, in case of shower solutions, mixer showers, shower outlets and taps, have a max water flow of 6 L/min or less attested by an existing label in the Union market. Do no significant harm (‘DNSH’) (2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex. (3) Sustainable use and protection of water and marine resources N/A (4) Transition to a circular economy N/A (5) Pollution prevention and control Building components and materials comply with the criteria set out in Appendix C to this Annex. In case of addition of thermal insulation to an existing building envelope, a building survey is carried out in accordance with national law by a competent specialist with training in asbestos surveying. Any stripping of lagging that contains or is likely to contain asbestos, breaking or mech anical drilling or screwing or removal of insulation board, tiles and other asbestos containing materials is carried out by appropriately trained personnel, with health monitoring before, during and after the works, in accordance with national law. (6) Protection and restoration of biodiversity and ecosystems N/A
Diese Angaben wurden ohne KI deterministisch aus den Tabellen der genannten Quelldokumente geparst. Fehler bei der PDF-Auswertung sind dennoch möglich – im Zweifel gilt das Quelldokument.